HOT TOPICS

Dr. Ellis Resurfacing Project

Project Status: 
Complete
Estimated Completion: 
Aug 2020

The proposed improvements are located within the Dr. Ellis Subdivision in Urbana. These roadways
include Beardsley Avenue, Romine Street, Eureka Street, Tremont Street, and Ellis Drive.
The work under this contract shall consist of the construction of:


• 2” surface removal of asphalt;
• 2” new asphalt surface;
• Bituminous surface treatment;
• Replacement of ADA sidewalk ramps in locations shown;
• Other work as necessary to complete construction as shown in the plans and required by the specifications